What should be done if the pipes of the sewage treatment equipment in the slaughterhouse are clogged?
- Category: Industry News
- Author:
- Source:
- Release time:2022-03-16 16:41
- Pageview:
What should be done if the pipes of the sewage treatment equipment in the slaughterhouse are clogged?
- Category: Industry News
- Author:
- Source:
- Release time:2022-03-16 16:41
- Pageview:
A certain amount of wastewater will be produced during the slaughtering process. The wastewater mainly comes from post-slaughtering cleaning, crushing flushing, aerial flushing, and wastewater from livestock manure, etc. The wastewater contains a large amount of organic matter, including animal manure, blood, animal hair, minced skin and meat, and fat, etc. It belongs to high-concentration organic wastewater. If it is directly discharged into water bodies without treatment, It will cause severe eutrophication of water bodies, damage the inherent capacity of water bodies, and seriously affect the surrounding environment. The development of this equipment has disclosed the treatment methods for slaughterhouse wastewater. The technical treatment scope involved includes the steps of dry-wet separation, flocculation sedimentation, decolorization and ammonia nitrogen removal, through the mixing of catalytic water and flocculation.

The processes of ammonia nitrogen removal and decolorization have significantly increased the disposal speed and time of slaughterhouse wastewater, reduced the disposal cost of such wastewater, and are conducive to addressing the wastewater discharge issue generated by slaughterhouses. Some users have reported that after using the slaughterhouse wastewater treatment equipment for a period of time, there is a phenomenon of pipe blockage. This indicates that the equipment was not cleaned in time during use or there are too many impurities in the wastewater. So, what methods can be used to deal with the pipe blockage of the slaughterhouse wastewater treatment equipment? After the pipe rack is manufactured, anti-rust treatment should be carried out in a timely manner and proper markings should be made.
When prefabricating pipelines, it is necessary to consider in advance whether transportation and installation are convenient, and leave adjustment openings. After prefabrication is completed, the interior of the pipeline should be cleaned thoroughly and the openings sealed. For the team formation work of prefabricated pipes, it is necessary to stop on the steel platform for pipe processing. For stainless steel pipes, it should be stopped on the wooden platform.
During the past few decades, we have grown up one of the top Irrigation System provider in China and have dedicated ourselves to developing and manufacturing the qualified agricultural and commercial irrigation products.
Whatsapp: 0591 13055284768
Email:tina@arthasplastic.com
Address:No.258 Xinju Village, Yangxia Street, Fuqing, Fuzhou, Fujian, China
Mobile